Managed to remove the drain pan and ridiculously heavy tub (thanks to Rollin for the help). Also demolished some additional drywall around where the tub was. Planning on removing all drywall up to the ceiling vault and around the windows to prepare for the backer board for the tile.
Notice the water damaged insulation. Yea for shoddy work!

The next step is to get the remaining drywall removed and plan everything out. Then I'll start sweatin' some pipe. Woo-wee!!!
0 comments:
Post a Comment