After getting back from my offshore trip I managed to get the moisture barrier installed and the plumbing to the shower valve roughed in. Slowly but surely it's coming along.
The plumbing is roughed in (not soldered up yet). All I need to do now is solder it all up and then check for leaks. Kinda scary.
0 comments:
Post a Comment